|

AL SAHAB BUILDING RAOUCHE
|
|
|
|
|
Power Steel has developed a facade scaffolding -
coupler system containing a side ladder for fast climbing.
It is composed from vertical frames and connectors and can be erected very quickly
on sloppy ground at production rate of 400m²/day (4 skilled labors ). It
is also very useful for residential tower and high rise buildings.
|
 
|